admin
2025-01-22 7e31442f0e9b07764e9c6a9680d3d4aeba5fe1de
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Quintiq file version 2.0
#parent: #root
Attribute NumberOfPeriodsSmartPlan
{
  #keys: '3[122872.1.889593977][122872.1.889593974][122872.1.889593978]'
  Description:
  [*
    The number of base periods that will be considered in SmartPlan. At the default value of 1, only the selected pispip and all of its upstream processes/pispips are included. 
    At a value of 2, it includes the selected pispip, the previous pispip and all their upstream processes/pispips, etc.
    For example, if there are two pisp A and B and 5 periods and ther is a lane with a leadtime of 2 periods between the pisps then:
    If the Smart plan starts from pispip(B,5) with a NumberOfPeriodsSmartPlan of 1, then the Smart plan will consider pispip(B,5) and pispip(A,3).
    If the Smart plan starts from pispip (B,5) with a NumberOfPeriodsSmartPlan of 3, then the Smart plan will consider pispip(B,3), pispip(B,4), pispip(B,5) and pispip(A,1), pispip(A,2) and pispip(A,3)
  *]
  ValueType: Number
}