1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
  | Quintiq file version 2.0 
 |  #parent: #root 
 |  Attribute NumberOfPeriodsSmartPlan 
 |  { 
 |    #keys: '3[122872.1.889593977][122872.1.889593974][122872.1.889593978]' 
 |    Description: 
 |    [* 
 |      The number of base periods that will be considered in SmartPlan. At the default value of 1, only the selected pispip and all of its upstream processes/pispips are included.  
 |      At a value of 2, it includes the selected pispip, the previous pispip and all their upstream processes/pispips, etc. 
 |      For example, if there are two pisp A and B and 5 periods and ther is a lane with a leadtime of 2 periods between the pisps then: 
 |      If the Smart plan starts from pispip(B,5) with a NumberOfPeriodsSmartPlan of 1, then the Smart plan will consider pispip(B,5) and pispip(A,3). 
 |      If the Smart plan starts from pispip (B,5) with a NumberOfPeriodsSmartPlan of 3, then the Smart plan will consider pispip(B,3), pispip(B,4), pispip(B,5) and pispip(A,1), pispip(A,2) and pispip(A,3) 
 |    *] 
 |    ValueType: Number 
 |  } 
 |  
  |